| -Installation of a new front gate |
| -52 tons of limestone screenings dumped
onto lane leading to pavilion |
| -Stripped old paint from runway strips |
| -Resealed the concrete runway and
repainted the stripes |
| -Patched the holes in the roof of the
pavilion |
|
-Installed lighting
system allowing for anyone with a car to power the lights
|
| -Re-framed the back wall of the pavilion
and installed siding on the outside |
|
-Hauled in 300 TONS of dirt and filled
in the dip at the south end of the concrete runway
|
| -Installed a new shelving unit in the
pavilion |
| -Tore down old chicken wire ceiling |
-Attached Celotex to new framing
allowing for a very warm pavilion this winter.
|