Other Construction News

-Installation of a new front gate
-52 tons of limestone screenings dumped onto lane leading to pavilion
-Stripped old paint from runway strips
-Resealed the concrete runway and repainted the stripes
-Patched the holes in the roof of the pavilion

-Installed lighting system allowing for anyone with a car to power the lights

-Re-framed the back wall of the pavilion and installed siding on the outside

-Hauled in 300 TONS of dirt and filled in the dip at the south end of the concrete runway

-Installed a new shelving unit in the pavilion
-Tore down old chicken wire ceiling

-Attached Celotex to new framing allowing for a very warm pavilion this winter.